Site icon Techplayon

5G MSG3 – PUSCH Scheduled Transmission by RAR UL grant

Introduction

When we want to connect a UE to 5G network, it has to synchronize in downlink as well as in uplink. Downlink synchronization is obtained after successfully decoding SSB, In order to establish uplink synchronization and RRC connection, UE has to perform RACH random access procedure.

In Contention based, RACH UE does follow four step as shown in below picture and listed below.

In this post we will discuss in detail about the Msg3.

The MSG3 is very first PUSCH transmission scheduled by MSG2 with the RAR UL grant. A UL grant includes scheduling information for frequency hopping, frequency and time domain resource allocation, MCS, and transmit power control necessary information required for MSG3.

MSG 3 – Frequency Domain Resource Allocation

An active UL bandwidth part (BWP) is indicated by higher layers for a PUSCH transmission scheduled by a RAR UL grant. For determining the frequency domain resource allocation for the PUSCH transmission within the active UL BWP UE does follow below mentioned steps.

In both cases, despite the start RB may be different, the maximum no. of RBs for frequency domain resource allocation always equals the number of RBs in the initial UL BWP.

The frequency domain resource allocation is by uplink resource allocation type 1. For an initial UL BWP size of  RBs, a UE processes the frequency domain resource assignment field as follows:

For a PUSCH transmission with frequency hopping scheduled by RAR UL grant or for a Msg3 PUSCH retransmission, the frequency offset for the second hop can be considered from Table below.

MSG 3 – Time Domain Resource Allocation

With reference to time slots for a PUSCH transmission scheduled by a RAR UL grant, if a UE receives a PDSCH with a RAR message ending in slot n for a corresponding PRACH transmission from the UE, the UE transmits the PUSCH in slot n + k2 + Δ, where k2 and Δ.

Time resource allocation is a set of 4 bits which represents a index to a PUSCH time domain resource allocation configuration table of up to 16 entries:

The UE may assume a minimum time between the last symbol of a PDSCH reception conveying a RAR message with a RAR UL grant and the first symbol of a corresponding PUSCH transmission scheduled by the RAR UL grant is equal to NT,1 + NT,2 + 0.5 msec,

where:

Other Consideration

References:

Related Post:



Exit mobile version