Site icon Techplayon

O-RAN WG10 – All about New Workgroup

O-RAN has formed a new workgroup with its workgroup number as “WG10” and workgroup name “Operation And Maintenance Work Group” or simply “OAM Work Group“.

This workgroup is responsible for the OAM requirements, OAM architecture and the O1 interface. All these activities were part of workgroup 1 earlier but have now been moved to WG10 after its formation.

Charter: 

Work Group 10 has full responsibility for the O1 interface OAM specifications for O-RAN, including unified O1 interface operation and notification, and for creating a detailed OAM architecture and requirements consistent with the overall OAM architecture described in the WG1 O-RAN Architecture document. This includes a set of information models/data models for O-RAN.

Objectives

Work Group 10 objectives will include:

References:

Related Posts:



Exit mobile version